Box Canyon Project Studies

Public Utility District No. 1 of Pend Oreille County, in Washington state, selected EES Consulting as the lead consultant for relicensing studies for the Box Canyon Hydroelectric Project.  The relicensing involved numerous engineering and resource studies.  EES Consulting staff members performed studies and managed and coordinated activities of consultants and subconsultants who conducted engineering and environmental studies for project license amendment and relicensing.

Featured Projects

Anchorage Municipal Power & Light

EES Consulting has prepared Integrated Resource Plans (IRP) for ML&P since 2002 to assist ML&P with the evaluation of capital spending throughout ML&P, covering transmission and distribution, generation, SCADA systems, use of dual fuels, and other related areas.  To evaluate the alternatives available to ML&P for future generation, the IRP was developed as a tool for examining the economic, engineering and other attributes associated with various options.

Grays Harbor PUD Integrated Resource Plan

EES Consulting prepared Grays Harbor’s 2020 Integrated Resource Plan. Grays Harbor is required to submit an IRP to the state of Washington every two years that demonstrates how it will meet the electric power needs of its members with a reliable supply of power delivered in the most cost-effective manner. The 2020 IRP was an evaluation of resource alternatives that could be deployed to meet Grays Harbor’s load and meet state of Washington renewable energy requirements under the Energy Independence Act and carbon-free energy requirements under the Clean Energy Transformation Act. Grays Harbor embarked on an IRP to study alternative sources of supply that could best serve its customers’ needs for the period 2021-2040.